First-party fictional feasibility brief. No actual site, survey, mapping evidence, permit or construction approval. Audience: a community board considering a concept called Common Field. Ask: approve a$42,000 feasibility study, proposed to last eight weeks. No funding or approval has been secured. The concept assumes a10hectare parcel. Proposed, nonoverlapping allocation: ecological space4ha; recreation3ha; built facilities2ha; paths1ha. These sum to10ha. Derived shares40%,30%,20%,10%. This is an area allocation, not a surveyed plan, actual boundary geometry or proof that the programme fits a real site. Feasibility questions remain open: no flood assessment, ecological survey or access study is complete. No site permissions are secured. Do not infer flood risk, environmental benefit, construction suitability, exact coordinates or walking distances. Study request: survey work$18,000; ecology review$12,000; access study$8,000; contingency$4,000. Total$42,000. This funds a proposed feasibility phase, not land acquisition or construction. The proposed eight-week duration is a planning assumption. No start date, guaranteed approval, construction date or completed study result is supplied. An original generated terrain-relief image may set the visual context. Label it as conceptual, not a survey, actual site image or a mapped representation of the four allocations. Show quantitative areas separately with precise proportions and readable labels.